Site: | Financial Institution (Q) |
---|---|
Manufacturer: | IBM |
Cores: | 3,000 |
Memory: | |
Processor: | Opteron Dual Core 2C 2.2GHz |
Interconnect: | Gigabit Ethernet |
Performance | |
Linpack Performance (Rmax) | 6.648 TFlop/s |
Theoretical Peak (Rpeak) | 13.2 TFlop/s |
Power Consumption | |
Power: | 195.00 kW (Submitted) |
Software | |
Operating System: | Windows Compute Cluster Server 2003 |
List | Rank | System | Vendor | Total Cores | Rmax (TFlops) | Rpeak (TFlops) | Power (kW) |
---|---|---|---|---|---|---|---|
11/2007 | 409 | BladeCenter LS21, Opteron Dual Core 2.2 GHz, GigEthernet, Windows | IBM | 3,000 | 6.6 | 13.2 | 195.00 |