ASC Purple


System Name ASC Purple
Site DOE/NNSA/LLNL
System Family IBM pSeries
System Model pSeries 575
Computer eServer pSeries p5 575 1.9 GHz
Vendor IBM
URL http://www.llnl.gov/asc/comput...
Application area Research
Main Memory 48832 GB
Installation Year 2006
 
Operating System AIX
Memory 48832 GB
Interconnect Federation
Processor POWER5 1900 MHz (7.6 GFlops)

The Advanced Simulation and Computing (ASC) Program's Purple system stands in testimony to the successful realization of the bold vision expressed one decade earlier—the development of the complex three-dimensional integrated weapons performance applications and their demonstration on computers capable of successfully running these extraordinary codes.

ASC Purple was a partnership between the DOE/NNSA Advanced Simulation and Computing Program (historically known as ASCI, now ASC) and IBM Corporation with Lawrence Livermore National Laboratory as the lead laboratory. The ASC Purple contract scheduled the demonstration of 100-teraFLOPS peak performance in June 2005. This represents the contract for the long-held major milestone in the ASC program conceived in 1996—achieving 100 teraFLOPS for the simulation of performance and safety for the Stockpile Stewardship Program. In 1996, the three ASC Laboratories (Lawrence Livermore National Laboratory, Los Alamos National Laboratory and Sandia National Laboratories) each had approximately 50-gigaFLOPS peak computational capability.

The ASC program accelerated the United States computer industry to meet the 100-teraFLOPS goal in the 2004–2005 timeframe. With this IBM contract, the NNSA/ASC program met this goal as planned. The total contract value for ASC Purple and ancillary equipment was $230 million. This contract had multiple deliveries of hardware to Livermore, of which Purple and BlueGene/L are the two major components. Purple is the 100-teraFLOPS (1.0×1014 or one hundred trillion floating-point operations per second) system. It is a genuinely huge machine based on symmetric shared-memory multiprocessors (SMP) containing more than 12,000 next-generation IBM POWER5 microprocessors.

Purple requires 7.5 MW of electrical power for the computer and cooling equipment, the equivalent electrical power of 7,500 average homes. Additionally, the full system generates more than 16,000,000 Btu/h in heat, requiring new air-handling designs and specifications. For more information about ASC Purple, read the SuperComputing2005 ASC Purple brochure.

ASC Purple is housed in the Terascale Simulation Facility (TSF).

The ASC Program appointed a team to formulate a governance model for allocating resources and scheduling the stockpile stewardship workload on ASC capability systems. The document describes a model that is devised to allocate capability-computing resources for weapons laboratory deliverables that merit priority on this class of resource and that cannot be reasonably attempted on other resources. For additional details, see the Capability Compute System Scheduling Governance Model for the ASC Program. Requests for allocation of resources on ASC Purple are made by submitting the Capability Computing Campaign Proposal Form.


Click the images below for bigger versions: