The following table shows previous lists and the number of systems installed when the list was published. Site Efficiency in the table is SUM(Rmax)/SUM(Rpeak), expressed as a percentage.

List Systems Highest Ranking Sum Rmax
(GFlops)
Sum Rpeak
(GFlops)
Site Efficiency
(%)
11/2007 1 442 6272.00 7360.00 85.22
06/2007 1 201 6272.00 7360.00 85.22
06/2004 1 334 790.70 921.60 85.80
11/2003 1 174 790.70 921.60 85.80
06/2003 1 85 790.70 921.60 85.80
11/2002 1 67 790.70 921.60 85.80
06/2002 1 41 790.70 921.60 85.80
11/2001 1 26 790.70 921.60 85.80
06/2001 1 21 790.70 921.60 85.80
11/1998 1 357 21.60 24.00 90.00
06/1998 1 237 21.60 24.00 90.00
11/1997 1 150 21.60 24.00 90.00
06/1997 1 117 21.60 24.00 90.00
11/1996 1 78 21.60 24.00 90.00
06/1996 1 53 21.60 24.00 90.00
11/1995 1 43 21.60 24.00 90.00
06/1995 1 37 21.60 24.00 90.00
11/1994 1 18 21.30 24.00 88.75
06/1994 1 17 21.30 24.00 88.75