Hokkaido University


The following table shows previous lists and the number of systems installed when the list was published. Site Efficiency in the table is SUM(Rmax)/SUM(Rpeak), expressed as a percentage.

List Systems Highest Ranking Sum Rmax
(GFlops)
Sum Rpeak
(GFlops)
Site Efficiency
(%)
06/2007 1 404 4596.00 5376.00 85.49
11/2006 1 156 4596.00 5376.00 85.49
06/2006 1 110 4596.00 5376.00 85.49
11/2002 1 320 229.00 256.00 89.45
06/2002 1 241 229.00 256.00 89.45
11/2001 1 131 229.00 256.00 89.45
06/2001 1 107 229.00 256.00 89.45
11/2000 1 87 229.00 256.00 89.45
06/2000 1 65 229.00 256.00 89.45
11/1998 1 356 21.60 24.00 90.00
06/1998 1 236 21.60 24.00 90.00
11/1997 1 149 21.60 24.00 90.00
06/1997 1 116 21.60 24.00 90.00
11/1996 1 77 21.60 24.00 90.00
06/1996 1 52 21.60 24.00 90.00
11/1995 1 42 21.60 24.00 90.00
06/1995 1 36 21.60 24.00 90.00
11/1994 1 326 1.82 3.00 60.57
06/1994 1 261 1.82 3.00 60.57
11/1993 1 198 1.82 3.00 60.57
06/1993 1 162 1.67 3.00 55.73