DOE/Knolls Atomic Power Laboratory
The following table shows previous lists and the number of systems installed when the list was published. Site Efficiency in the table is SUM(Rmax)/SUM(Rpeak), expressed as a percentage.
| List | Systems | Highest Ranking | Sum Rmax (GFlops) |
Sum Rpeak (GFlops) |
Site Efficiency (%) |
|---|---|---|---|---|---|
| 06/2007 | 2 | 289 | 9501.00 | 12002.00 | 79.16 |
| 11/2006 | 2 | 122 | 9501.00 | 12002.00 | 79.16 |
| 06/2006 | 1 | 131 | 4035.00 | 5232.00 | 77.12 |
| 11/2005 | 2 | 97 | 5855.00 | 8019.00 | 73.01 |
| 06/2005 | 2 | 76 | 5855.00 | 8019.00 | 73.01 |
| 11/2004 | 1 | 151 | 1820.00 | 2787.00 | 65.30 |
| 06/1998 | 1 | 474 | 13.70 | 15.24 | 89.91 |
| 11/1997 | 1 | 301 | 13.70 | 15.24 | 89.91 |
| 06/1997 | 1 | 198 | 13.70 | 15.24 | 89.91 |
| 11/1996 | 1 | 124 | 13.70 | 15.24 | 89.91 |
| 06/1996 | 1 | 84 | 13.70 | 15.24 | 89.91 |
| 11/1995 | 1 | 63 | 13.70 | 15.24 | 89.91 |
| 06/1995 | 2 | 51 | 15.84 | 17.91 | 88.49 |
| 11/1994 | 2 | 29 | 15.84 | 17.91 | 88.49 |
| 06/1994 | 2 | 29 | 15.84 | 17.91 | 88.49 |
| 11/1993 | 2 | 16 | 15.84 | 17.91 | 88.49 |
| 06/1993 | 2 | 11 | 15.84 | 17.91 | 88.49 |