| List | Systems | Highest Ranking | Sum Rmax (GFlops) |
Sum Rpeak (GFlops) |
Site Efficiency (%) |
|---|---|---|---|---|---|
| 11/2007 | 1 | 457 | 6155.00 | 8800.00 | 69.94 |
| 06/2007 | 1 | 217 | 6155.00 | 8800.00 | 69.94 |
| 11/2006 | 1 | 107 | 6155.00 | 8800.00 | 69.94 |
| 06/2006 | 2 | 77 | 8237.00 | 11462.40 | 71.86 |
| 11/2005 | 3 | 57 | 10234.00 | 14595.80 | 70.12 |
| 06/2005 | 3 | 46 | 10234.00 | 14595.80 | 70.12 |
| 11/2004 | 3 | 28 | 9788.00 | 14595.80 | 67.06 |
| 06/2004 | 3 | 19 | 9788.00 | 14595.80 | 67.06 |
| 11/2003 | 1 | 319 | 520.70 | 1008.00 | 51.66 |
| 06/2003 | 1 | 180 | 520.70 | 1008.00 | 51.66 |