Grid Technology Research Center, AIST


The following table shows previous lists and the number of systems installed when the list was published. Site Efficiency in the table is SUM(Rmax)/SUM(Rpeak), expressed as a percentage.

List Systems Highest Ranking Sum Rmax
(GFlops)
Sum Rpeak
(GFlops)
Site Efficiency
(%)
11/2007 1 457 6155.00 8800.00 69.94
06/2007 1 217 6155.00 8800.00 69.94
11/2006 1 107 6155.00 8800.00 69.94
06/2006 2 77 8237.00 11462.40 71.86
11/2005 3 57 10234.00 14595.80 70.12
06/2005 3 46 10234.00 14595.80 70.12
11/2004 3 28 9788.00 14595.80 67.06
06/2004 3 19 9788.00 14595.80 67.06
11/2003 1 319 520.70 1008.00 51.66
06/2003 1 180 520.70 1008.00 51.66