RZG/Max-Planck-Gesellschaft MPI/IPP


The following table shows previous lists and the number of systems installed when the list was published. Site Efficiency in the table is SUM(Rmax)/SUM(Rpeak), expressed as a percentage.

List Systems Highest Ranking Sum Rmax
(GFlops)
Sum Rpeak
(GFlops)
Site Efficiency
(%)
06/2008 2 19 115443.00 168115.20 68.67
11/2007 1 41 21910.00 27850.00 78.67
06/2007 1 411 4563.50 5228.80 87.28
11/2006 1 159 4563.50 5228.80 87.28
06/2006 2 113 7298.50 10553.60 69.16
11/2005 2 83 7298.50 10553.60 69.16
06/2005 2 113 5803.00 10796.80 53.75
11/2004 1 75 2735.00 5324.80 51.36
06/2004 1 66 2198.44 4274.40 51.43
11/2003 1 31 2198.44 4274.40 51.43
06/2003 3 24 2665.20 5037.60 52.91
11/2002 2 21 2365.00 4397.60 53.78
06/2002 2 82 868.00 1568.80 55.33
11/2001 1 80 355.00 487.20 72.87
06/2001 1 65 355.00 487.20 72.87
11/2000 1 50 355.00 487.20 72.87
06/2000 1 36 355.00 487.20 72.87
11/1999 1 25 355.00 487.20 72.87
06/1999 1 19 355.00 487.20 72.87
11/1998 1 15 355.00 487.20 72.87
06/1998 1 7 342.00 470.40 72.70
11/1997 1 9 196.00 403.20 48.61
06/1997 1 9 176.00 307.20 57.29
11/1996 2 34 63.20 96.00 65.83
06/1996 1 122 12.80 19.20 66.67
11/1995 1 96 12.80 19.20 66.67
11/1994 1 488 1.16 1.33 86.95
06/1994 1 374 1.16 1.33 86.95
11/1993 1 288 1.16 1.33 86.95
06/1993 1 242 1.16 1.33 86.95