DOE/Knolls Atomic Power Laboratory
In June 1993, 2 systems appeared in the TOP500 list.
| Rank | System | Procs | Memory(GB) | Rmax (GFlops) | Rpeak (GFlops) | Vendor |
|---|---|---|---|---|---|---|
| 11 | Y-MP C916/16256 | 16 | N/A | 13.7 | 15.238 | Cray Inc. |
| 96 | Y-MP8/864 | 8 | N/A | 2.144 | 2.667 | Cray Inc. |
In June 1993, 2 systems appeared in the TOP500 list.
| Rank | System | Procs | Memory(GB) | Rmax (GFlops) | Rpeak (GFlops) | Vendor |
|---|---|---|---|---|---|---|
| 11 | Y-MP C916/16256 | 16 | N/A | 13.7 | 15.238 | Cray Inc. |
| 96 | Y-MP8/864 | 8 | N/A | 2.144 | 2.667 | Cray Inc. |